WELDING SERVICES

Phillips vast welding and fabrication facility builds machine frames, cutter booms for continuours miners, fabricates cutter drums and much more.  The latest techniques, such as the stress relief of heavy fabricated components, are standard, not optional, at Phillips.

 

The turnaround for emergency cutter drum service is 48 hours... not 3 to 10 weeks.  Both speed and quality continue to make Phillips number one in service.

 

CUTTER DRUM LACING

Phillips Machine continues to guarantee accurate attack angles and lateral spacing on every set of cutter drums we repair. Repeatability, exacting precision and consistency are the direct result of our CNC cutter drum lacing center. A complete lacing pattern is stored on computer hard drive for every drum by customer. We continue to provide the leading edge of coal cutting technology.

 

We provide cutter drums for most miners either new, rebuilt, or on a service exchange basis.

welding, shuttle car, continuous miner, mining equipment, repair, rebuild, beckley, wv

 

Industrial Related Business:  Zach Thompson, (304) 673-3306 | Cell, zthompson@phillipsmachine.com

Beckley, WV Facility: Allen Taylor, (304) 255-0537 | Office, ataylor@phillipsmachine.com

Phillips Affiliates:

 
 
 
Social Media
  Facebook
  Youtube
Organization
China.PhillipsMachine.com
SouthAfrica.PhillipsMachine.com
Combs.PhillipsMachine.com
Australia.PhillipsMachine.com
Careers.PhillipsMachine.com
Phillips Technologies
Contact Us
(800) 733-1521 (24/7)
webinquiry@phillipsmachine.com